Skip to main content

12 Change Order Engineering jobs

Showing 1–12 of 12 jobs

V

Bologna, IT (On-site)

€35–44K / year

Who are we? At Vertiv, we’re on a mission to empower the people that will power the future.

2 wk. ago

C

Tulsa, Oklahoma, US (On-site)

$135–155K / year

Crusoe is on a mission to accelerate the abundance of energy and intelligence .

5 mo. ago

C

Arvada, Colorado, US (On-site)

$95–106K / year

Crusoe is on a mission to accelerate the abundance of energy and intelligence .

1 wk. ago

E

Cupertino, California, US (On-site)

About Etched Etched is building AI chips that are hard-coded for individual model architectures.

10 mo. ago

V

Kansas City, Missouri, US (On-site)

POSITION SUMMARY ​Plans, directs, and coordinates activities of designated large-scale projects.

2 mo. ago

C

Warrenton, Missouri, US (On-site)

$160.9–195K / year

Crusoe is on a mission to accelerate the abundance of energy and intelligence .

5 mo. ago

Related searches