V
Bologna, IT (On-site)
€35–44K / year
Who are we? At Vertiv, we’re on a mission to empower the people that will power the future.
6 mo. ago
Showing 1–20 of 24 jobs
Bologna, IT (On-site)
€35–44K / year
Who are we? At Vertiv, we’re on a mission to empower the people that will power the future.
6 mo. ago
Santa Catarina, Nuevo León, MX (On-site)
Job Summary The SFA (Special Feature Authorization) Mechanical Engineer will contribute to the design and release of customizations to computer room…
3 wk. ago
SK (On-site)
€21.4–26.8K / year
POSITION SUMMARY The Mechanical Design Engineer will contribute to the development of new products; work in a cross-functional environment with…
1 mo. ago
Westerville, Ohio, US (On-site)
We are seeking an experienced Systems Engineer that will lead the design of Single Phase, In Row and In Rack, Coolant Distribution Units (CDUs).
1 mo. ago
Tulsa, Oklahoma, US (On-site)
$135–155K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
5 mo. ago
Arvada, Colorado, US (On-site)
$180–210K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
5 days ago
Arvada, Colorado, US (On-site)
$95–106K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
2 mo. ago
Pecém, São Gonçalo do Amarante, Ceará, BR (On-site)
RESPONSABILIDADES Produzir documentação técnica para a região (LATAM) de acordo com a direção da Linha de Produtos.
7 mo. ago
Arvada, Colorado, US (On-site)
$160–180K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
3 mo. ago
Santa Clara, California, US (On-site)
$168–264.5K / year
NVIDIA has been transforming computer graphics, PC gaming, and accelerated computing for more than 25 years.
4 wk. ago
Santa Clara, California, US (On-site)
$136–264.5K / year
NVIDIA has been transforming computer graphics, PC gaming, and accelerated computing for more than 25 years.
4 wk. ago
San Francisco, California, US (Hybrid)
$500–850K / year
About Anthropic Anthropic’s mission is to create reliable, interpretable, and steerable AI systems.
1 mo. ago
Cupertino, California, US (On-site)
About Etched Etched is building AI chips that are hard-coded for individual model architectures.
2 yr. ago
Santa Clara, California, US (On-site)
$131.3–305.5K / year
NVIDIA is leading the way in groundbreaking developments in Artificial Intelligence, High-Performance Computing and Visualization.
2 wk. ago
Yokne'am, Northern District, IL (On-site)
NVIDIA is looking for best-in-class Physical Design CAD Engineer to join our outstanding Networking Silicon engineering team, developing the…
3 wk. ago
Johor, MY (On-site)
POSITION SUMMARY The Mechanical Design Engineer will contribute to the development of new products; work in a cross-functional environment with…
4 wk. ago
桃園區, Taoyuan, TW (On-site)
About Etched Etched is building hardware for frontier intelligence.
5 mo. ago
San Francisco, California, US (Hybrid)
$226–300K / year
About the Team OpenAI’s Hardware organization is building the infrastructure foundation for frontier AI systems.
1 mo. ago
Sunnyvale, California, US (On-site)
$180–220K / year
Applied Intuition, Inc.
2 mo. ago
Santa Clara, California, US (On-site)
$184–287.5K / year
Join us at NVIDIA, where we are transforming computer graphics, PC gaming, and AI industries with groundbreaking technology and a strong dedication…
4 wk. ago