C
Senior Project Engineer
Crusoe
Tulsa, Oklahoma, US (On-site)
$135–155K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
5 mo. ago
Showing 1–14 of 14 jobs
Crusoe
Tulsa, Oklahoma, US (On-site)
$135–155K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
5 mo. ago
Arvada, Colorado, US (On-site)
$160–180K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
3 mo. ago
Vertiv
SK (On-site)
€21.4–26.8K / year
POSITION SUMMARY The Mechanical Design Engineer will contribute to the development of new products; work in a cross-functional environment with…
2 wk. ago
Vertiv
Westerville, Ohio, US (On-site)
We are seeking an experienced Systems Engineer that will lead the design of Single Phase, In Row and In Rack, Coolant Distribution Units (CDUs).
3 wk. ago
桃園區, Taoyuan, TW (On-site)
About Etched Etched is building hardware for frontier intelligence.
4 mo. ago
Pecém, São Gonçalo do Amarante, Ceará, BR (On-site)
RESPONSABILIDADES Produzir documentação técnica para a região (LATAM) de acordo com a direção da Linha de Produtos.
7 mo. ago
Applied Intuition
Sunnyvale, California, US (On-site)
$180–220K / year
Applied Intuition, Inc.
1 mo. ago
San Francisco, California, US (Hybrid)
$226–300K / year
About the Team OpenAI’s Hardware organization is building the infrastructure foundation for frontier AI systems.
2 wk. ago
Santa Clara, California, US (On-site)
$184–287.5K / year
Join us at NVIDIA, where we are transforming computer graphics, PC gaming, and AI industries with groundbreaking technology and a strong dedication…
1 wk. ago
Johor, MY (On-site)
POSITION SUMMARY The Mechanical Design Engineer will contribute to the development of new products; work in a cross-functional environment with…
6 days ago
Warrenton, Missouri, US (On-site)
$160.9–195K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
6 mo. ago
Livingston, New Jersey, US (On-site)
$207–275K / year
CoreWeave is The Essential Cloud for AI™.
2 mo. ago
Denver, Colorado, US (On-site)
$225–255K / year
Crusoe is on a mission to accelerate the abundance of energy and intelligence .
1 mo. ago
NVIDIA
Santa Clara, California, US (On-site)
$68–138K / year
NVIDIA has been transforming computer graphics, PC gaming, and accelerated computing for more than 25 years.
3 mo. ago